Roofs we’ve

signed for

Houses are most of what we do. These are the bigger roofs other crews passed on, and some of the houses whose owners still call us.

Roofs we’ve

signed for

Houses are most of what we do. These are the bigger roofs other crews passed on, and some of the houses whose owners still call us.

Roofs we’ve

signed for

Houses are most of what we do. These are the bigger roofs other crews passed on, and some of the houses whose owners still call us.

Houses, in their owners’ words

Most of our year is slate, seam and cedar on houses built between 1900 and 1940.

Houses, in their owners’ words

Most of our year is slate, seam and cedar on houses built between 1900 and 1940.

“Two other roofers told us to tear the slate off. Headlap reused most of it, matched the rest, and the house looks like 1924 again, just dry.”

Margaret O.

Laurelhurst

· Slate restoration, 2025

“Dale’s crew cut every slate on the turret to its own taper. Eleven winters of a ceiling stain, gone in the first one.”

Ellen and James W.

Irvington

· Slate turret and copper, 2023

“The price was the price. The one rotten valley they found, they photographed and showed us before touching it.”

Daniel and Priya K.

Sellwood

· Standing seam, 2024

“Every morning the foreman texted what they’d open that day and how they’d close it if rain came. It came twice. Nothing got wet.”

Harold B.

Eastmoreland

· Slate and copper valleys, 2024

“They talked us out of cedar for the north slope and into seam. Four winters later it still sheds every needle off the fir.”

Tom R.

St. Johns

· Seam and copper bay, 2022

“I called the leak line at seven on a November night. Someone was on the roof with a tarp by nine, and back on Friday with the right flashing.”

Lena M.

Buckman

· Leak repair, 2025

“They sorted every old slate on the lawn, kept two thirds and found the rest at the same Vermont quarry. You can’t see where the new ones went.”

The Okafor family

Kenton

· Slate relay, 2021

“We had a small budget and they didn’t try to upsell it. Good shingle, proper flashing, copper where it mattered, and the written price is what we paid.”

Sam and Jo P.

Alameda

· Architectural shingle, 2023

“After the ice storm they tarped us first and quoted later. When we did redo the roof, the tarp visit came off the bill.”

Greg H.

Mount Tabor

· Storm repair, then standing seam, 2024

Let’s get on your roof.

Forty-five minutes on the ladder, photos of every plane and a written price within 48 hours. Free inside Portland city limits.

Let’s get on your roof.

Forty-five minutes on the ladder, photos of every plane and a written price within 48 hours. Free inside Portland city limits.

Let’s get on your roof.

Forty-five minutes on the ladder, photos of every plane and a written price within 48 hours. Free inside Portland city limits.

© Headlap Roofing Co. Licensed, bonded and insured in Oregon.

© Headlap Roofing Co. Licensed, bonded and insured in Oregon.

© Headlap Roofing Co. Licensed, bonded and insured in Oregon.

Create a free website with Framer, the website builder loved by startups, designers and agencies.