A Craftsman house newly roofed in natural slate, with copper gutters, valley and chimney flashing
A Craftsman house newly roofed in natural slate, with copper gutters, valley and chimney flashing

Roofs for the
next century.

Natural slate, standing seam and cedar for Portland’s older houses. Surveyed from the ladder, priced in writing, laid by our own crews since 1996.

Irvington, 1912 Craftsman

Vermont slate, copper valley and gutters · 2025

Slate, seam and cedar for Portland’s older houses

Our own crews lay every roof from one written price, under a foreman you’ll know by name. Family owned in Sellwood since 1996.

Slate, seam and cedar for Portland’s older houses

Our own crews lay every roof from one written price, under a foreman you’ll know by name. Family owned in Sellwood since 1996.

A Craftsman bungalow with a new natural slate roof and copper gutters

Ladd’s Addition, 1914

Vermont slate, copper gutters · 26 squares in 9 weeks

Ladd’s Addition, 1914

Vermont slate, copper gutters · 26 squares in 9 weeks

A slate dormer with copper flashing on a Portland house

Eastmoreland, 1926

Slate dormer, copper step flashing

1996

Family owned since, three generations on the tools

31

Roofers on our own payroll, no subcontractors

4

Crews, each with one foreman from survey to walkthrough

25

yrs

Workmanship warranty that moves with the house

Roofs we’ve signed for

Houses are most of what we do. These are the bigger roofs other crews passed on.

Roofs we’ve signed for

Houses are most of what we do. These are the bigger roofs other crews passed on.

Same house, eleven weeks apart.

The house in March: worn shingle roof thick with moss and a blue tarpThe same house in June with a new slate roof and copper guttersMarch · moss, four leaksJune · Vermont slate

House

1912 Craftsman

Roof

34 squares slate

On site

11 weeks

Copper

Gutters, valleys

01

From the ladder to the last downspout

The same foreman from the first photo to the last, and every step goes into your job file.

01

Day 1

Survey on the ladder

Forty-five minutes on the roof, photos of every plane, moisture readings at the valleys and a look in the attic.

01

Day 1

Survey on the ladder

Forty-five minutes on the roof, photos of every plane, moisture readings at the valleys and a look in the attic.

02

Within 48 hours

A price in writing

A fixed price with the photos, a drawn roof plan and every line item. It only moves if the deck surprises us, and you see why first.

02

Within 48 hours

A price in writing

A fixed price with the photos, a drawn roof plan and every line item. It only moves if the deck surprises us, and you see why first.

03

Build day 1

Tear-off

Gardens tarped, magnets swept twice a day, nothing left open if the forecast turns.

03

Build day 1

Tear-off

Gardens tarped, magnets swept twice a day, nothing left open if the forecast turns.

04

2–12 days

Course by course

Rotten boards replaced, ice and water shield three feet up every eave, then each course lapped over the one two below.

04

2–12 days

Course by course

Rotten boards replaced, ice and water shield three feet up every eave, then each course lapped over the one two below.

05

Alongside

Copper, formed on site

Valleys, step flashing, chimney crickets and gutters bent and soldered in the driveway, fitted to this roof.

05

Alongside

Copper, formed on site

Valleys, step flashing, chimney crickets and gutters bent and soldered in the driveway, fitted to this roof.

06

Last day

Walkthrough and warranty

We walk the roof with you on the photos, hand over a 25-year workmanship warranty, and come back after the first big storm.

06

Last day

Walkthrough and warranty

We walk the roof with you on the photos, hand over a 25-year workmanship warranty, and come back after the first big storm.

Priced and laid by the same crew

No salespeople and no subcontracted slaters. The person who prices your roof runs the crew that lays it.

Priced and laid by the same crew

No salespeople and no subcontracted slaters. The person who prices your roof runs the crew that lays it.

Dale Reyes, foreman of Crew 2, on the scaffold beside a slate roof

“If something surprises us under the old roof, you hear it from me, with a photo, before we touch it.”

Dale Reyes

Foreman, Crew 2 · 19 years with Headlap

Ruth Calder

Owner

On the tools since 1996, runs the yard and the copper shop

Theo Marsh

Estimator

Books surveys and answers the office line

31

Roofers on payroll

4

Crews

11

Average years with us

Owners who’d call us again

“Two other roofers told us to tear the slate off. Headlap reused most of it, matched the rest, and the house looks like 1924 again, just dry.”

Margaret O.

Laurelhurst

· Slate restoration, 2025

“Dale’s crew cut every slate on the turret to its own taper. Eleven winters of a ceiling stain, gone in the first one.”

Ellen and James W.

Irvington

· Slate turret and copper, 2023

“The price was the price. The one rotten valley they found, they photographed and showed us before touching it.”

Daniel and Priya K.

Sellwood

· Standing seam, 2024

“Every morning the foreman texted what they’d open that day and how they’d close it if rain came. It came twice. Nothing got wet.”

Harold B.

Eastmoreland

· Slate and copper valleys, 2024

“They talked us out of cedar for the north slope and into seam. Four winters later it still sheds every needle off the fir.”

Tom R.

St. Johns

· Seam and copper bay, 2022

“I called the leak line at seven on a November night. Someone was on the roof with a tarp by nine, and back on Friday with the right flashing.”

Lena M.

Buckman

· Leak repair, 2025

“They sorted every old slate on the lawn, kept two thirds and found the rest at the same Vermont quarry. You can’t see where the new ones went.”

The Okafor family

Kenton

· Slate relay, 2021

“We had a small budget and they didn’t try to upsell it. Good shingle, proper flashing, copper where it mattered, and the written price is what we paid.”

Sam and Jo P.

Alameda

· Architectural shingle, 2023

“After the ice storm they tarped us first and quoted later. When we did redo the roof, the tarp visit came off the bill.”

Greg H.

Mount Tabor

· Storm repair, then standing seam, 2024

“Two other roofers told us to tear the slate off. Headlap reused most of it, matched the rest, and the house looks like 1924 again, just dry.”

Margaret O.

Laurelhurst

· Slate restoration, 2025

“Dale’s crew cut every slate on the turret to its own taper. Eleven winters of a ceiling stain, gone in the first one.”

Ellen and James W.

Irvington

· Slate turret and copper, 2023

“The price was the price. The one rotten valley they found, they photographed and showed us before touching it.”

Daniel and Priya K.

Sellwood

· Standing seam, 2024

“Every morning the foreman texted what they’d open that day and how they’d close it if rain came. It came twice. Nothing got wet.”

Harold B.

Eastmoreland

· Slate and copper valleys, 2024

“They talked us out of cedar for the north slope and into seam. Four winters later it still sheds every needle off the fir.”

Tom R.

St. Johns

· Seam and copper bay, 2022

“I called the leak line at seven on a November night. Someone was on the roof with a tarp by nine, and back on Friday with the right flashing.”

Lena M.

Buckman

· Leak repair, 2025

“They sorted every old slate on the lawn, kept two thirds and found the rest at the same Vermont quarry. You can’t see where the new ones went.”

The Okafor family

Kenton

· Slate relay, 2021

“We had a small budget and they didn’t try to upsell it. Good shingle, proper flashing, copper where it mattered, and the written price is what we paid.”

Sam and Jo P.

Alameda

· Architectural shingle, 2023

“After the ice storm they tarped us first and quoted later. When we did redo the roof, the tarp visit came off the bill.”

Greg H.

Mount Tabor

· Storm repair, then standing seam, 2024

“Two other roofers told us to tear the slate off. Headlap reused most of it, matched the rest, and the house looks like 1924 again, just dry.”

Margaret O.

Laurelhurst

· Slate restoration, 2025

“Dale’s crew cut every slate on the turret to its own taper. Eleven winters of a ceiling stain, gone in the first one.”

Ellen and James W.

Irvington

· Slate turret and copper, 2023

“The price was the price. The one rotten valley they found, they photographed and showed us before touching it.”

Daniel and Priya K.

Sellwood

· Standing seam, 2024

“Every morning the foreman texted what they’d open that day and how they’d close it if rain came. It came twice. Nothing got wet.”

Harold B.

Eastmoreland

· Slate and copper valleys, 2024

“They talked us out of cedar for the north slope and into seam. Four winters later it still sheds every needle off the fir.”

Tom R.

St. Johns

· Seam and copper bay, 2022

“I called the leak line at seven on a November night. Someone was on the roof with a tarp by nine, and back on Friday with the right flashing.”

Lena M.

Buckman

· Leak repair, 2025

“They sorted every old slate on the lawn, kept two thirds and found the rest at the same Vermont quarry. You can’t see where the new ones went.”

The Okafor family

Kenton

· Slate relay, 2021

“We had a small budget and they didn’t try to upsell it. Good shingle, proper flashing, copper where it mattered, and the written price is what we paid.”

Sam and Jo P.

Alameda

· Architectural shingle, 2023

“After the ice storm they tarped us first and quoted later. When we did redo the roof, the tarp visit came off the bill.”

Greg H.

Mount Tabor

· Storm repair, then standing seam, 2024

What a roof costs per year

Divide the price by the years it lasts and slate stops looking expensive. Pick a house size.

What a roof costs per year

Divide the price by the years it lasts and slate stops looking expensive. Pick a house size.

Roof

0

25

50

75

100

125

150 yrs

Installed

Per year

Natural slate

$67.2k–$95.2k

$448–$1.2k / yr

Standing seam

$37.8k–$51.8k

$540–$1k / yr

Cedar shake

$30.8k–$42k

$770–$1.4k / yr

Architectural shingle

$18.2k–$25.2k

$607–$1k / yr

Low-slope membrane

$25.2k–$36.4k

$840–$1.5k / yr

Copper bar: lowest cost per year at this size. Installed prices include tear-off, deck repair allowance, underlayment and flashing. Portland. Your survey gives the real number.

Natural slate

$448–$1.2k / yr

Standing seam

$540–$1k / yr

Cedar shake

$770–$1.4k / yr

Architectural shingle

$607–$1k / yr

Low-slope membrane

$840–$1.5k / yr

Copper bar: lowest cost per year at this size. Installed prices include tear-off, deck repair allowance, underlayment and flashing. Portland. Your survey gives the real number.

Two roofers securing a tarp over a storm-damaged roof

Leaking tonight?

A roofer answers, every day October to April, 6am to 10pm.

Tonight

You call, we answer

We ask where the water is coming in and what to move.

Within 24 h

Tarped and photographed

Dated photos and measurements for your insurer.

Next dry day

Fixed properly

Flashing, valley or slate, with a written price first.

Tonight

You call, we answer

We ask where the water is coming in and what to move.

Within 24 h

Tarped and photographed

Dated photos and measurements for your insurer.

Next dry day

Fixed properly

Flashing, valley or slate, with a written price first.

Questions we get

All

Slate

Copper

Storms and insurance

Working with us

Still unsure? Ask Theo.

(503) 555-0148

, weekdays 7 to 5

Often most of it can. Good slate outlives two or three sets of nails. We sort every slate as it comes off, relay the sound ones and match the rest from the same quarry where it still runs.

Most older Portland houses were framed for heavy roofs. We check rafter size and span in the attic during the survey; where it needs help, sistering a few rafters is usually a day’s work.

It changes the paperwork more than the roof. We prepare the samples and drawings the review board asks for and match profiles, colours and copper details to the period.

Copper outlasts the slate under it, can be soldered watertight on site and is easy to repair. On a 100-year roof, aluminium gutters and flashing are the first thing to fail.

Slowly. It goes bronze within a year and takes fifteen to thirty years in Portland air to reach the green patina. We can pre-patinate it if you want the colour now.

Yes. We open only as much roof as we can close the same day, every crew carries tarps sized for the job, and slate and copper work often runs right through winter.

Yes. We document damage with dated photos and measurements, meet the adjuster on site if you want us there, and write the scope in the format adjusters expect.

Ten percent secures the dates and orders material; the balance is due at the walkthrough. Slate jobs are billed in stages because slate is ordered by the pallet.

A Craftsman bungalow in Portland with a new slate roof and copper gutters

Let’s get on your roof.

Forty-five minutes on the ladder, photos of every plane and a written price within 48 hours. Free inside Portland city limits.

A foreman does your survey

Not a salesperson. The person who prices your roof runs the crew that lays it.

Book a roof survey

We call back within one working day.

Thanks. Your survey request is in.

The office will call you within one working day to set a time on the ladder.

© Headlap Roofing Co. Licensed, bonded and insured in Oregon.

© Headlap Roofing Co. Licensed, bonded and insured in Oregon.

© Headlap Roofing Co. Licensed, bonded and insured in Oregon.

Create a free website with Framer, the website builder loved by startups, designers and agencies.