Roofs for the
next century.
Natural slate, standing seam and cedar for Portland’s older houses. Surveyed from the ladder, priced in writing, laid by our own crews since 1996.

1996
Family owned since, three generations on the tools
31
Roofers on our own payroll, no subcontractors
4
Crews, each with one foreman from survey to walkthrough
25
yrs
Workmanship warranty that moves with the house

Standing seam, winery
· 2024
Fernhill Barrel Hall
Zinc-grey standing seam over a new insulated deck on a 1920s timber hall, phased around harvest so it never closed.
Roof
4,800 sq ft
On site
5 weeks
Harvest days lost
None
Same house, eleven weeks apart.
House
1912 Craftsman
Roof
34 squares slate
On site
11 weeks
Copper
Gutters, valleys
From the ladder to the last downspout
The same foreman from the first photo to the last, and every step goes into your job file.

“If something surprises us under the old roof, you hear it from me, with a photo, before we touch it.”
Dale Reyes
Foreman, Crew 2 · 19 years with Headlap

Ruth Calder
Owner
On the tools since 1996, runs the yard and the copper shop

Theo Marsh
Estimator
Books surveys and answers the office line
31
Roofers on payroll
4
Crews
11
Average years with us
Owners who’d call us again

Leaking tonight?
A roofer answers, every day October to April, 6am to 10pm.
Questions we get
All
Slate
Copper
Storms and insurance
Working with us

Still unsure? Ask Theo.
(503) 555-0148
, weekdays 7 to 5
Often most of it can. Good slate outlives two or three sets of nails. We sort every slate as it comes off, relay the sound ones and match the rest from the same quarry where it still runs.
Most older Portland houses were framed for heavy roofs. We check rafter size and span in the attic during the survey; where it needs help, sistering a few rafters is usually a day’s work.
It changes the paperwork more than the roof. We prepare the samples and drawings the review board asks for and match profiles, colours and copper details to the period.
Copper outlasts the slate under it, can be soldered watertight on site and is easy to repair. On a 100-year roof, aluminium gutters and flashing are the first thing to fail.
Slowly. It goes bronze within a year and takes fifteen to thirty years in Portland air to reach the green patina. We can pre-patinate it if you want the colour now.
Yes. We open only as much roof as we can close the same day, every crew carries tarps sized for the job, and slate and copper work often runs right through winter.
Yes. We document damage with dated photos and measurements, meet the adjuster on site if you want us there, and write the scope in the format adjusters expect.
Ten percent secures the dates and orders material; the balance is due at the walkthrough. Slate jobs are billed in stages because slate is ordered by the pallet.

Let’s get on your roof.
Forty-five minutes on the ladder, photos of every plane and a written price within 48 hours. Free inside Portland city limits.

A foreman does your survey
Not a salesperson. The person who prices your roof runs the crew that lays it.

























